About the Project
The new JQUS will be a 175,000 square foot, 6 story, steel framed middle upper school with outdoor classroom space on the roof as well as a solar array. The Construction Manager at Risk’s scope of work is expected to include the following: enabling work at 152 Arlington Street to ready swing space for the existing JQUS 6th. & 7th. Grade classes currently housed at the 900 Washington Street campus; demolition of the existing JQUS two story pre cast concrete 900 Washington Street structure and of the existing Boston Chinese Evangelical Church building; and construction of the new JQUS facility to include a media center, a gym, a black box theater, a proscenium stage theater, locker rooms, roof terrace with outdoor classrooms, academic, physical-education, administrative and support spaces. The project also includes site improvements, including landscaping and re-configuration of the surrounding alleys, streets, sidewalks and crosswalks.
Project Team
Boston Public Facilities Dept
Kerrie Griffin, Director
Ellen McDonough, Chief of Staff
Carleton W. Jones, Assistant Director of Operations
Rohn MacNulty, Senior Project Manager
Skanska
Jim Dowd, Project Director
Susan Gleason, Senior Program Manager
Nery Pascoa, Site Representative
HMFH
Pip Lewis, Principal
Deborah Collins, Senior Associate
Melissa Greene, Senior Associate
Matt LaRue, Senior Associate
Alicia Crothers, Senior Associate
Julie Darling, Associate
Turner Construction Company
Jamie Meiser, Project Director
Jack Dawson, Superintendent
Daniela Ojeda, Engineer
Ted Saltz, Engineer
Kristyn Moen, Engineer
Andrew Hart, MEP Manager
Sabina Kintzer-Shorey, Assistant Superintendent
Christian Giuliano, Assistant Superintendent
Abby VanVlaenderen, Assistant Engineer
Megan Petruzziello, Safety Manager
Glenda Nestor, Admin