About the Project

The new JQUS will be a 175,000 square foot, 6 story, steel framed middle upper school with outdoor classroom space on the roof as well as a solar array. The Construction Manager at Risk’s scope of work is expected to include the following: enabling work at 152 Arlington Street to ready swing space for the existing JQUS 6th. & 7th. Grade classes currently housed at the 900 Washington Street campus; demolition of the existing JQUS two story pre cast concrete 900 Washington Street structure and of the existing Boston Chinese Evangelical Church building; and construction of the new JQUS facility to include a media center, a gym, a black box theater, a proscenium stage theater, locker rooms, roof terrace with outdoor classrooms, academic, physical-education, administrative and support spaces. The project also includes site improvements, including landscaping and re-configuration of the surrounding alleys, streets, sidewalks and crosswalks.

Project Team

Boston Public Facilities Dept

Kerrie Griffin, Director

Ellen McDonough, Chief of Staff

Carleton W. Jones, Assistant Director of Operations

Rohn MacNulty, Senior Project Manager

Skanska

Jim Dowd, Project Director

Susan Gleason, Senior Program Manager

Nery Pascoa, Site Representative

HMFH

Pip Lewis, Principal

Deborah Collins, Senior Associate

Melissa Greene, Senior Associate

Matt LaRue, Senior Associate

Alicia Crothers, Senior Associate

Julie Darling, Associate

Turner Construction Company

Jamie Meiser, Project Director

Jack Dawson, Superintendent

Daniela Ojeda, Engineer

Ted Saltz, Engineer

Kristyn Moen, Engineer

Andrew Hart, MEP Manager

Sabina Kintzer-Shorey, Assistant Superintendent 

Christian Giuliano, Assistant Superintendent 

Abby VanVlaenderen, Assistant Engineer

Megan Petruzziello, Safety Manager

Glenda Nestor, Admin